Concrete Calculator

✓ Formula checked against cited sourcesLast updated October 11, 2026How we test

Enter your measurements to get the volume of concrete, the number of pre-mixed bags, and an optional cost estimate. Switch to metric at any time.

ft
ft
in

4 in (10 cm) is standard for patios and walkways; 5–6 in for driveways.

%

Covers spillage, uneven ground and over-excavation. 5–10% is typical.

per cu yd

Concrete needed (with waste)

1.36 cu yd

  • Concrete for the pour 91%
  • Waste allowance 9%
Volume before waste
1.23 cu yd
Cubic feet (with waste)
36.7 cu ft
Pre-mixed bags
62 bags
  • Over about 1 cubic yard (0.75 m³), ordering ready-mix from a truck is usually easier and cheaper than mixing bags.

The short answer

To find how much concrete you need, multiply length × width × thickness, all in feet, then divide by 27 to get cubic yards. Add 5–10% for waste. A 10 × 10 ft slab that is 4 inches thick needs 1.23 cubic yards, or about 1.36 cubic yards with 10% extra. That is roughly 62 bags of 80 lb concrete, which is why most pours over one cubic yard use ready-mix.

How the calculation works

Concrete is ordered by volume. In the US that means cubic yards, and in most other countries cubic metres. The calculator works out the volume of the shape you are pouring, adds your waste allowance, then converts that volume into bags.

Shape Formula
Slab, patio or driveway length × width × thickness
Wall footing length × footing width × footing depth
Round column or post hole π × (diameter ÷ 2)² × height × number of holes

Keep your units consistent. If the length and width are in feet, convert the thickness from inches to feet (divide by 12) before multiplying. One cubic yard is 27 cubic feet, and one cubic metre is 1.308 cubic yards.

Worked example

A 12 × 16 ft patio poured 4 inches thick:

  1. 12 × 16 × (4 ÷ 12) = 64 cubic feet
  2. 64 ÷ 27 = 2.37 cubic yards
  3. Add 10% for waste: 2.37 × 1.10 = 2.61 cubic yards

At that size, a ready-mix delivery is the practical choice. The same job would take about 118 bags of 80 lb concrete, including the 10% extra.

How many bags you need

Pre-mixed bags list their yield on the label. These are the typical yields for standard concrete mix:

Bag size Yield per bag Bags per cubic yard Bags per cubic metre
40 lb (18 kg) 0.30 cu ft 90 118
50 lb (23 kg) 0.375 cu ft 72 95
60 lb (27 kg) 0.45 cu ft 60 79
80 lb (36 kg) 0.60 cu ft 45 59

These counts are before waste. Yields vary a little between brands and mix types, so check the bag you are buying. For metric bags the calculator uses the same yield per kilogram as a standard 80 lb bag, about 0.47 litres per kilogram of dry mix.

Concrete needed for common slab sizes

Volumes at 4 inches thick, before and after a 10% waste allowance:

Slab size Cubic yards With 10% extra 80 lb bags (with extra)
4 × 4 ft 0.20 0.22 10
10 × 10 ft 1.23 1.36 62
12 × 12 ft 1.78 1.96 88
10 × 20 ft 2.47 2.72 123
20 × 20 ft 4.94 5.43 245
24 × 24 ft (two-car garage) 7.11 7.82 352

Tips before you order

  • Measure the actual depth in several places. A slab planned at 4 inches often averages closer to 4.5 inches once the subgrade is dug, which adds about 12% to the volume.
  • Round up when ordering ready-mix. Most suppliers sell in quarter- or half-yard increments, and a short load costs more than a little leftover.
  • Ask about short-load fees. Many plants add a fee for orders under a few yards. Compare that against the cost of bags.
  • Have the base ready. A compacted gravel base, typically 4 inches, helps the slab drain and resists cracking. Use the gravel calculator to size it.

Frequently asked questions

How many 80 lb bags of concrete are in a cubic yard?

An 80 lb bag of pre-mixed concrete yields about 0.60 cubic feet, so a cubic yard (27 cubic feet) takes 45 bags before any allowance for waste. With 10% extra, plan on about 50 bags.

How many 60 lb bags make a cubic yard?

A 60 lb bag yields about 0.45 cubic feet, so you need 60 bags per cubic yard, or about 66 with 10% extra.

How thick should a concrete slab be?

Four inches is the usual thickness for patios, sidewalks and most garage floors. Driveways that carry heavier vehicles are commonly poured 5 to 6 inches thick. Check your local building code for structural slabs.

How much extra concrete should I order?

Order 5–10% more than the calculated volume. Ground is rarely perfectly flat, forms bow slightly, and running short in the middle of a pour creates a weak cold joint.

Is it cheaper to buy bags or ready-mix concrete?

Bags make sense for small jobs such as setting posts or pouring a small pad. For anything over about one cubic yard, ready-mix is usually cheaper per yard and far less labour, though many suppliers charge a short-load fee for small orders.

How do I calculate concrete for a round post hole?

Multiply π (3.1416) by the radius squared by the depth. A 12-inch-diameter hole that is 4 feet deep holds about 3.14 cubic feet, a little over five 80 lb bags.

Sources

  1. Quikrete – Concrete Mix product data (bag yields)
  2. American Concrete Institute – Concrete Q&A

Related calculators

About this calculator. Every formula on this page is tested against worked examples from the sources above before publishing. Results are estimates for planning; confirm with your supplier or local code.

Spotted a problem? Tell us and we will check it.